House Building Packages

Two-storey house building - turnkey, materials included

Turnkey building of a two-storey house: ALLMAR supplies materials, labour, equipment, formwork and supervision from foundations, structure, slab casting and stairs to finishes. The price per m² is set after a site surve…

← All ALLMAR Construction services

Short answer

Turnkey building of a two-storey house: ALLMAR supplies materials, labour, equipment, formwork and supervision from foundations, structure, slab casting and stairs to finishes. The price per m² is set after a site survey.

Building a two-storey house involves more critical work: the concrete structure, floor-slab casting, stairs and waterproofing upstairs. The turnkey two-storey house package makes ALLMAR Construction responsible for materials, labour and quality together, following the structural drawings and cost plan you approve.

Package type: Turnkey (materials included) · Two storeys. Prices start from Rp5.300.000 per m² for a standard specification. The final price per m² is set after the site survey and drawings, itemised in a cost plan (RAB) and fitted to your budget.

What the package includes

  • All materials to the written specification in the cost plan (type, brand or equivalent, size) from foundations to finishes
  • Trades, helpers, foreman and site supervisor
  • Purchasing, transporting and storing materials on site
  • Tools, concrete mixers, scaffolding and formwork as needed
  • Samples of finishing materials (tiles, paint, sanitary ware) for your approval before installation
  • Electrical, clean-water and wastewater installation as drawn
  • Photo progress reports and final cleaning
  • A maintenance period after handover as stated in the contract

Discuss your project on WhatsApp

What is not included

  • PBG building approval and SLF certificate of occupancy (separate service)
  • New PLN electricity, PDAM water and gas connection fees
  • Loose furniture, kitchen sets, air-conditioners, curtains and other interiors not listed in the cost plan
  • Work outside the drawings; priced through a signed variation (add/omit) record
  • Major site preparation, retaining walls, boundary fences and gardens, unless listed in the cost plan
  • Design and working drawings if you do not have them yet (ALLMAR can prepare them as a separate service)

Main works for a two-storey house

A two-storey house gives more space on the same plot, which is why it is common in cities with high land prices. The structure carries the upper floor, so the size of foundations, columns, beams and floor slab must follow a structural calculation, not habit.

ALLMAR does not cast a floor slab or roof deck without clear reinforcement drawings. Reinforcement is checked before casting, concrete is cured long enough before formwork is struck, and pipe and cable routes between floors are planned before casting so the slab never has to be broken open.

On narrow, closely built plots, upper-floor work needs safety netting, side screening and coordination with neighbours and the local neighbourhood office. We discuss this during the survey.

  1. Site clearing, setting out and profile boards
  2. Pad footings or another foundation type as calculated for the soil
  3. Ground beams, columns and structural beams to the reinforcement drawings
  4. Formwork, scaffolding and casting the floor slab or roof deck
  5. Concrete or steel staircase and railing
  6. Walls, render, skim coat, roof frame and covering
  7. Waterproofing of roof decks, balconies and upstairs bathrooms
  8. Electrical and plumbing between floors, frames, ceilings, floors and painting

One party responsible from materials to handover

With a turnkey contract ALLMAR buys, delivers and installs the materials and hands over the house ready to live in, as drawn and costed. You do not deal with supply stores, quantities or deliveries.

The biggest market risk with turnkey building is quiet downgrading: materials swapped for a cheaper grade without the owner knowing. Every item in an ALLMAR cost plan therefore states its type, size and brand or equivalent, and you approve finishing samples first. The supervisor logs deliveries in photo reports.

You can still change your mind along the way. Each change is recorded in a variation record that you sign before the work is done, so the contract value is always clear.

Working with ALLMAR Construction: from consultation to handover

  1. Consultation. You tell us the plot size, rooms needed, preferred style and budget range.
  2. Site survey. ALLMAR checks the soil, truck access for deliveries, site water and power, and neighbouring buildings.
  3. Full cost plan. The cost plan itemises every task with quantities, material specifications and the price per m², so you can compare and fit it to your budget.
  4. Contract. Scope, specifications, schedule, progress-based payment stages, variations and the maintenance period are put in writing.
  5. Construction. ALLMAR supplies the materials and builds every stage, with finishing samples approved by you and photo progress reports.
  6. Handover. Joint inspection, snag fixing, a signed handover record (BAST), then the maintenance period begins.

We are based in Jakarta and build across Jabodetabek and other regions of Indonesia. Travel and accommodation for projects outside Jakarta are quoted separately in the cost plan.

How the price per m² is calculated

For turnkey work, the price per m² already covers materials to specification, labour, equipment, transport and supervision. Any price-adjustment terms are written into the contract before signing. The starting price of Rp5.300.000 per m² applies to a simple plan, standard specification and normal site access.

The figure depends mainly on:

  • Floor area and plan shape (a simple plan is more efficient than one with many corners)
  • Soil conditions and the foundation type required
  • Site access: road width, distance to supply stores and space to store materials
  • Number of bathrooms, ceiling height and roof form
  • The grade of finishing materials chosen
  • Project location and local labour rates
  • The target completion date

Tell us your budget range in the request form. We work within your budget: the scope, material grade or building phases are adjusted, and you receive a written cost plan before deciding.

Compare the four house-building packages

PackageMaterialsPriceBest when
Single-storey house building - labour only (materials by owner)Bought by ownerfrom Rp2.000.000/m²You have materials or a trusted supply store; a simple house
Two-storey house building - labour only (materials by owner)Bought by ownerfrom Rp2.500.000/m²You want to control material purchasing; a two-storey house
Single-storey house building - turnkey, materials includedSupplied by ALLMARfrom Rp4.500.000/m²You want it done without handling materials
Two-storey house building - turnkey, materials included (this page)Supplied by ALLMARfrom Rp5.300.000/m²You want one party responsible for a multi-storey structure

For a general guide to planning a house, permits and choosing a builder, read Houses and townhouses. This package is also listed on ALLMAR Store (allmar.id).

PBG and SLF are a separate service

The package does not include the Building Approval (PBG) or the Certificate of Occupancy (SLF). Under Government Regulation 16/2021, a house needs a PBG before construction starts, applied for through the SIMBG system with drawings that match what will be built. ALLMAR can handle it as a separate service: PBG and SLF at ALLMAR Law & Permit. Let us know your PBG status during the consultation so the drawings and schedule line up.

Request a survey and quote

What you get

  • One party responsible for structure and finishes
  • Casting follows checked reinforcement drawings
  • Written specifications and approved finishing samples
  • A maintenance period after handover as per contract

What to prepare

  • Proof of land ownership or right of use
  • Working and structural drawings (or ask us to prepare them separately)
  • PBG status (issued, in progress or not yet applied for)
  • Your budget range and target completion date

FAQ

How long does a two-storey house take to build?

It depends on size, design, weather and concrete curing time. A detailed stage schedule is prepared with the cost plan and written into the contract. ALLMAR works within your budget: share your budget range and our team fits the scope of work.

Can this package add a storey to an existing house?

For an existing house use our Adding storeys service, because the old structure must be checked and may need strengthening first. This package is for new houses.

Are interiors and kitchen sets included?

No, unless listed in the cost plan. Interiors can be added as separate work once the structure and main finishes are under way.

How much does a turnkey two-storey house cost per m²?

From Rp5.300.000 per m² for a standard specification. The price per m² is set after the survey, working drawings and structural design. Share your budget; the cost plan can be adjusted by material grade and building phases.