House Building Packages

Single-storey house building - labour only (materials by owner)

Labour-only contract to build a single-storey house: ALLMAR provides the trades, helpers, foreman and technical supervision, while the owner buys the materials. The price per m² is set after a site survey.

← All ALLMAR Construction services

Short answer

Labour-only contract to build a single-storey house: ALLMAR provides the trades, helpers, foreman and technical supervision, while the owner buys the materials. The price per m² is set after a site survey.

You have the land, a drawing or a clear idea of the house, and you want to buy the materials yourself? ALLMAR Construction’s labour-only package for a single-storey house provides the trades, helpers, foreman and supervisor from foundations to painting, while material choice and purchasing stay with you.

Package type: Labour only (materials by owner) · Single storey. Prices start from Rp2.000.000 per m² for a standard specification. The final price per m² is set after the site survey and drawings, itemised in a cost plan (RAB) and fitted to your budget.

What the package includes

  • Masons, steel fixers, carpenters or light-steel installers, painters and helpers as scheduled
  • A foreman who organises the daily work on site
  • ALLMAR technical supervision: dimensions, levels, reinforcement checks before casting, and workmanship
  • A material list for each stage (type, size and estimated quantity) at least a week before it is needed
  • Inspection of materials delivered to site before they are used
  • The trades’ hand tools (trowels, spirit levels, saws, drills, grinders and similar)
  • Photo progress reports and measured work (opname) as the basis for each payment stage
  • Clearing work debris from the building area at handover

Discuss your project on WhatsApp

What is not included

  • All building materials: cement, sand, stone, steel, bricks or AAC blocks, timber, light steel, roof tiles, ceramics, paint, pipes, cables, frames, doors and windows
  • Hire of heavy equipment, concrete mixers, vibrators and scaffolding, unless agreed in the cost plan
  • Site water and the temporary power connection
  • Design, working drawings and structural calculations (available as separate services)
  • PBG building approval and SLF certificate of occupancy
  • Demolition of an existing building, major filling and retaining walls, unless listed in the cost plan
  • New PLN electricity and PDAM water connection fees

Main works for a single-storey house

A single-storey house suits a larger plot, elderly occupants, or families who want every room reachable without stairs. The structure is lighter, so foundations and columns are smaller than in a multi-storey house and the works are simpler.

If you may add a storey one day, say so at the start. Foundations and columns can be designed for two storeys now, which costs far less than strengthening the structure later.

  1. Site clearing, setting out and profile boards
  2. Excavation and foundations (stone strip, pad footings or another type to suit the soil)
  3. Ground beams, columns and ring beams
  4. Brick or AAC block walls, render and skim coat
  5. Light-steel or timber roof frame and roof covering
  6. Frames, doors, windows, ceilings and floors
  7. Electrical, clean water and wastewater installation, and a septic tank or household treatment unit
  8. Painting and final finishes

Who does what: you supply the materials, ALLMAR builds

With a labour-only contract you buy and deliver the materials yourself, while ALLMAR provides the trades, helpers, foreman and technical supervision. Owners choose this when they want to control brands and material prices, already have a trusted building-supply store, or hold usable leftover materials.

The key is getting materials on time. ALLMAR therefore hands over a material list for each stage before it starts, with type, size and estimated quantity. If materials arrive late the trades cannot work; the waiting time is recorded in the daily report and the schedule is adjusted together, so there is no dispute later.

Material quality is the owner’s responsibility, but ALLMAR’s supervisor still inspects every delivery. Undersized reinforcing bars, lumpy cement or sand with too much silt are reported before use, not after the walls are up.

Working with ALLMAR Construction: from consultation to handover

  1. Consultation. You tell us the plot size, rooms needed, budget and any materials you already have.
  2. Site survey. ALLMAR checks the soil, access road, site water and power, and neighbouring buildings.
  3. Labour cost plan and material list. We prepare the labour price per m² and the stage-by-stage material list you will buy.
  4. Contract. Scope, schedule, payment stages based on measured progress, and what happens when materials are late are put in writing.
  5. Construction. The trades work under ALLMAR’s foreman and supervisor, with photo reports and reminders of the materials needed next.
  6. Handover. Joint inspection, snag fixing, then a signed handover record (BAST).

We are based in Jakarta and build across Jabodetabek and other regions of Indonesia. Travel and accommodation for projects outside Jakarta are quoted separately in the cost plan.

How the price per m² is calculated

For labour only, the price per m² covers wages for the trades, helpers, foreman and supervision. Materials are bought separately by you, so the total cost of the house is the labour contract plus your material purchases. The starting price of Rp2.000.000 per m² applies to a simple plan, standard specification and normal site access.

The figure depends mainly on:

  • Floor area and plan shape (a simple plan is more efficient than one with many corners)
  • Soil conditions and the foundation type required
  • Site access: road width, distance to supply stores and space to store materials
  • Number of bathrooms, ceiling height and roof form
  • The grade of finishing materials chosen
  • Project location and local labour rates
  • The target completion date

Tell us your budget range in the request form. We work within your budget: the scope, material grade or building phases are adjusted, and you receive a written cost plan before deciding.

Compare the four house-building packages

PackageMaterialsPriceBest when
Single-storey house building - labour only (materials by owner) (this page)Bought by ownerfrom Rp2.000.000/m²You have materials or a trusted supply store; a simple house
Two-storey house building - labour only (materials by owner)Bought by ownerfrom Rp2.500.000/m²You want to control material purchasing; a two-storey house
Single-storey house building - turnkey, materials includedSupplied by ALLMARfrom Rp4.500.000/m²You want it done without handling materials
Two-storey house building - turnkey, materials includedSupplied by ALLMARfrom Rp5.300.000/m²You want one party responsible for a multi-storey structure

For a general guide to planning a house, permits and choosing a builder, read Houses and townhouses. This package is also listed on ALLMAR Store (allmar.id).

PBG and SLF are a separate service

The package does not include the Building Approval (PBG) or the Certificate of Occupancy (SLF). Under Government Regulation 16/2021, a house needs a PBG before construction starts, applied for through the SIMBG system with drawings that match what will be built. ALLMAR can handle it as a separate service: PBG and SLF at ALLMAR Law & Permit. Let us know your PBG status during the consultation so the drawings and schedule line up.

Request a survey and quote

What you get

  • Labour price and scope agreed in writing before work starts
  • Stage-by-stage material lists so you do not overbuy
  • A supervisor checks materials and workmanship
  • Payments follow measured progress

What to prepare

  • Proof of land ownership or right of use
  • House drawings or a floor-plan sketch (if available)
  • PBG status (issued, in progress or not yet applied for)
  • A list of materials you already have

FAQ

Can I use labour only if I already bought some materials?

Yes. During the survey we record and check the materials you have, and the material list only covers what is still needed.

What happens if the materials I buy arrive late?

The waiting time is logged in the daily report and the schedule is adjusted together under the contract terms. We send material lists early so delays can be avoided.

How is a labour-only contract paid?

In stages based on measured completed work (opname), not daily wages. The number and size of stages are written in the contract.

How much is labour for a single-storey house per m²?

From Rp2.000.000 per m² for a standard specification. The price per m² is set after the survey and a look at the drawings, because soil, access, plan shape and location all affect it. Share your budget and we will prepare a matching cost plan.

Subscribe to ALLMAR regulation updates & business tips