
House Building Packages
Single-storey house building - turnkey, materials included
Turnkey building of a single-storey house: ALLMAR supplies materials to the written specification, labour, equipment and supervision until the house is ready to live in. The price per m² is set after a site survey.
← All ALLMAR Construction services
Short answer
Turnkey building of a single-storey house: ALLMAR supplies materials to the written specification, labour, equipment and supervision until the house is ready to live in. The price per m² is set after a site survey.
No time to deal with supply stores and builders yourself? The turnkey single-storey house package hands the whole job to ALLMAR Construction: materials, labour, equipment and supervision, from foundations to a house ready to live in, with specifications written into the cost plan.
Package type: Turnkey (materials included) · Single storey. Prices start from Rp4.500.000 per m² for a standard specification. The final price per m² is set after the site survey and drawings, itemised in a cost plan (RAB) and fitted to your budget.
What the package includes
- All materials to the written specification in the cost plan (type, brand or equivalent, size) from foundations to finishes
- Trades, helpers, foreman and site supervisor
- Purchasing, transporting and storing materials on site
- Tools, concrete mixers, scaffolding and formwork as needed
- Samples of finishing materials (tiles, paint, sanitary ware) for your approval before installation
- Electrical, clean-water and wastewater installation as drawn
- Photo progress reports and final cleaning
- A maintenance period after handover as stated in the contract
Discuss your project on WhatsApp
What is not included
- PBG building approval and SLF certificate of occupancy (separate service)
- New PLN electricity, PDAM water and gas connection fees
- Loose furniture, kitchen sets, air-conditioners, curtains and other interiors not listed in the cost plan
- Work outside the drawings; priced through a signed variation (add/omit) record
- Major site preparation, retaining walls, boundary fences and gardens, unless listed in the cost plan
- Design and working drawings if you do not have them yet (ALLMAR can prepare them as a separate service)
Main works for a single-storey house
A single-storey house suits a larger plot, elderly occupants, or families who want every room reachable without stairs. The structure is lighter, so foundations and columns are smaller than in a multi-storey house and the works are simpler.
If you may add a storey one day, say so at the start. Foundations and columns can be designed for two storeys now, which costs far less than strengthening the structure later.
- Site clearing, setting out and profile boards
- Excavation and foundations (stone strip, pad footings or another type to suit the soil)
- Ground beams, columns and ring beams
- Brick or AAC block walls, render and skim coat
- Light-steel or timber roof frame and roof covering
- Frames, doors, windows, ceilings and floors
- Electrical, clean water and wastewater installation, and a septic tank or household treatment unit
- Painting and final finishes
One party responsible from materials to handover
With a turnkey contract ALLMAR buys, delivers and installs the materials and hands over the house ready to live in, as drawn and costed. You do not deal with supply stores, quantities or deliveries.
The biggest market risk with turnkey building is quiet downgrading: materials swapped for a cheaper grade without the owner knowing. Every item in an ALLMAR cost plan therefore states its type, size and brand or equivalent, and you approve finishing samples first. The supervisor logs deliveries in photo reports.
You can still change your mind along the way. Each change is recorded in a variation record that you sign before the work is done, so the contract value is always clear.
Working with ALLMAR Construction: from consultation to handover
- Consultation. You tell us the plot size, rooms needed, preferred style and budget range.
- Site survey. ALLMAR checks the soil, truck access for deliveries, site water and power, and neighbouring buildings.
- Full cost plan. The cost plan itemises every task with quantities, material specifications and the price per m², so you can compare and fit it to your budget.
- Contract. Scope, specifications, schedule, progress-based payment stages, variations and the maintenance period are put in writing.
- Construction. ALLMAR supplies the materials and builds every stage, with finishing samples approved by you and photo progress reports.
- Handover. Joint inspection, snag fixing, a signed handover record (BAST), then the maintenance period begins.
We are based in Jakarta and build across Jabodetabek and other regions of Indonesia. Travel and accommodation for projects outside Jakarta are quoted separately in the cost plan.
How the price per m² is calculated
For turnkey work, the price per m² already covers materials to specification, labour, equipment, transport and supervision. Any price-adjustment terms are written into the contract before signing. The starting price of Rp4.500.000 per m² applies to a simple plan, standard specification and normal site access.
The figure depends mainly on:
- Floor area and plan shape (a simple plan is more efficient than one with many corners)
- Soil conditions and the foundation type required
- Site access: road width, distance to supply stores and space to store materials
- Number of bathrooms, ceiling height and roof form
- The grade of finishing materials chosen
- Project location and local labour rates
- The target completion date
Tell us your budget range in the request form. We work within your budget: the scope, material grade or building phases are adjusted, and you receive a written cost plan before deciding.
Compare the four house-building packages
| Package | Materials | Price | Best when |
|---|---|---|---|
| Single-storey house building - labour only (materials by owner) | Bought by owner | from Rp2.000.000/m² | You have materials or a trusted supply store; a simple house |
| Two-storey house building - labour only (materials by owner) | Bought by owner | from Rp2.500.000/m² | You want to control material purchasing; a two-storey house |
| Single-storey house building - turnkey, materials included (this page) | Supplied by ALLMAR | from Rp4.500.000/m² | You want it done without handling materials |
| Two-storey house building - turnkey, materials included | Supplied by ALLMAR | from Rp5.300.000/m² | You want one party responsible for a multi-storey structure |
For a general guide to planning a house, permits and choosing a builder, read Houses and townhouses. This package is also listed on ALLMAR Store (allmar.id).
PBG and SLF are a separate service
The package does not include the Building Approval (PBG) or the Certificate of Occupancy (SLF). Under Government Regulation 16/2021, a house needs a PBG before construction starts, applied for through the SIMBG system with drawings that match what will be built. ALLMAR can handle it as a separate service: PBG and SLF at ALLMAR Law & Permit. Let us know your PBG status during the consultation so the drawings and schedule line up.
What you get
- One contract, one party responsible
- Written material specifications to prevent downgrading
- You approve finishing samples first
- A maintenance period after handover as per contract
What to prepare
- Proof of land ownership or right of use
- House drawings, a plan sketch or examples of houses you like
- PBG status (issued, in progress or not yet applied for)
- Your budget range and target completion date
FAQ
Can I choose the material brands?
Yes. The cost plan can name your preferred brands or equivalents, and you approve finishing samples before they are installed.
What if material prices rise after signing?
Any price-adjustment terms are written clearly into the contract before signing. Changes of scope or specification at your request go through a signed variation record. ALLMAR works within your budget: share your budget range and our team fits the scope of work.
Is there a maintenance period after completion?
Yes. Its length and what it covers are stated in the contract.
How much does a turnkey single-storey house cost per m²?
From Rp4.500.000 per m² for a standard specification. The price per m² is set after the survey and working drawings, because material grade, soil, access and location all affect it. Share your budget and we will fit the cost plan to it.
