
House Building Packages
Two-storey house building - labour only (materials by owner)
Labour-only contract for a two-storey house: ALLMAR trades, helpers, foreman and supervisor build the foundations, columns, beams, floor slab, stairs and finishes; materials by owner. The price per m² is set after a sit…
← All ALLMAR Construction services
Short answer
Labour-only contract for a two-storey house: ALLMAR trades, helpers, foreman and supervisor build the foundations, columns, beams, floor slab, stairs and finishes; materials by owner. The price per m² is set after a site survey.
A two-storey house demands more structural care than a single-storey one: column and beam reinforcement, slab formwork, deck casting and stairs. With the labour-only package for a two-storey house, you supply the materials and ALLMAR provides a crew used to multi-storey structures, under technical supervision.
Package type: Labour only (materials by owner) · Two storeys. Prices start from Rp2.500.000 per m² for a standard specification. The final price per m² is set after the site survey and drawings, itemised in a cost plan (RAB) and fitted to your budget.
What the package includes
- Masons, steel fixers, carpenters or light-steel installers, painters and helpers as scheduled
- A foreman who organises the daily work on site
- ALLMAR technical supervision: dimensions, levels, reinforcement checks before casting, and workmanship
- A material list for each stage (type, size and estimated quantity) at least a week before it is needed
- Inspection of materials delivered to site before they are used
- The trades’ hand tools (trowels, spirit levels, saws, drills, grinders and similar)
- Photo progress reports and measured work (opname) as the basis for each payment stage
- Clearing work debris from the building area at handover
Discuss your project on WhatsApp
What is not included
- All building materials: cement, sand, stone, steel, bricks or AAC blocks, timber, light steel, roof tiles, ceramics, paint, pipes, cables, frames, doors and windows
- Hire of heavy equipment, concrete mixers, vibrators and scaffolding, unless agreed in the cost plan
- Site water and the temporary power connection
- Design, working drawings and structural calculations (available as separate services)
- PBG building approval and SLF certificate of occupancy
- Demolition of an existing building, major filling and retaining walls, unless listed in the cost plan
- New PLN electricity and PDAM water connection fees
Main works for a two-storey house
A two-storey house gives more space on the same plot, which is why it is common in cities with high land prices. The structure carries the upper floor, so the size of foundations, columns, beams and floor slab must follow a structural calculation, not habit.
ALLMAR does not cast a floor slab or roof deck without clear reinforcement drawings. Reinforcement is checked before casting, concrete is cured long enough before formwork is struck, and pipe and cable routes between floors are planned before casting so the slab never has to be broken open.
On narrow, closely built plots, upper-floor work needs safety netting, side screening and coordination with neighbours and the local neighbourhood office. We discuss this during the survey.
- Site clearing, setting out and profile boards
- Pad footings or another foundation type as calculated for the soil
- Ground beams, columns and structural beams to the reinforcement drawings
- Formwork, scaffolding and casting the floor slab or roof deck
- Concrete or steel staircase and railing
- Walls, render, skim coat, roof frame and covering
- Waterproofing of roof decks, balconies and upstairs bathrooms
- Electrical and plumbing between floors, frames, ceilings, floors and painting
Who does what: you supply the materials, ALLMAR builds
With a labour-only contract you buy and deliver the materials yourself, while ALLMAR provides the trades, helpers, foreman and technical supervision. Owners choose this when they want to control brands and material prices, already have a trusted building-supply store, or hold usable leftover materials.
The key is getting materials on time. ALLMAR therefore hands over a material list for each stage before it starts, with type, size and estimated quantity. If materials arrive late the trades cannot work; the waiting time is recorded in the daily report and the schedule is adjusted together, so there is no dispute later.
Material quality is the owner’s responsibility, but ALLMAR’s supervisor still inspects every delivery. Undersized reinforcing bars, lumpy cement or sand with too much silt are reported before use, not after the walls are up.
Working with ALLMAR Construction: from consultation to handover
- Consultation. You tell us the plot size, rooms needed, budget and any materials you already have.
- Site survey. ALLMAR checks the soil, access road, site water and power, and neighbouring buildings.
- Labour cost plan and material list. We prepare the labour price per m² and the stage-by-stage material list you will buy.
- Contract. Scope, schedule, payment stages based on measured progress, and what happens when materials are late are put in writing.
- Construction. The trades work under ALLMAR’s foreman and supervisor, with photo reports and reminders of the materials needed next.
- Handover. Joint inspection, snag fixing, then a signed handover record (BAST).
We are based in Jakarta and build across Jabodetabek and other regions of Indonesia. Travel and accommodation for projects outside Jakarta are quoted separately in the cost plan.
How the price per m² is calculated
For labour only, the price per m² covers wages for the trades, helpers, foreman and supervision. Materials are bought separately by you, so the total cost of the house is the labour contract plus your material purchases. The starting price of Rp2.500.000 per m² applies to a simple plan, standard specification and normal site access.
The figure depends mainly on:
- Floor area and plan shape (a simple plan is more efficient than one with many corners)
- Soil conditions and the foundation type required
- Site access: road width, distance to supply stores and space to store materials
- Number of bathrooms, ceiling height and roof form
- The grade of finishing materials chosen
- Project location and local labour rates
- The target completion date
Tell us your budget range in the request form. We work within your budget: the scope, material grade or building phases are adjusted, and you receive a written cost plan before deciding.
Compare the four house-building packages
| Package | Materials | Price | Best when |
|---|---|---|---|
| Single-storey house building - labour only (materials by owner) | Bought by owner | from Rp2.000.000/m² | You have materials or a trusted supply store; a simple house |
| Two-storey house building - labour only (materials by owner) (this page) | Bought by owner | from Rp2.500.000/m² | You want to control material purchasing; a two-storey house |
| Single-storey house building - turnkey, materials included | Supplied by ALLMAR | from Rp4.500.000/m² | You want it done without handling materials |
| Two-storey house building - turnkey, materials included | Supplied by ALLMAR | from Rp5.300.000/m² | You want one party responsible for a multi-storey structure |
For a general guide to planning a house, permits and choosing a builder, read Houses and townhouses. This package is also listed on ALLMAR Store (allmar.id).
PBG and SLF are a separate service
The package does not include the Building Approval (PBG) or the Certificate of Occupancy (SLF). Under Government Regulation 16/2021, a house needs a PBG before construction starts, applied for through the SIMBG system with drawings that match what will be built. ALLMAR can handle it as a separate service: PBG and SLF at ALLMAR Law & Permit. Let us know your PBG status during the consultation so the drawings and schedule line up.
What you get
- A crew experienced with multi-storey structures
- Reinforcement checked before every pour
- Stage-by-stage material lists, including formwork needs
- Payments follow measured progress
What to prepare
- Proof of land ownership or right of use
- Working and structural drawings (or ask us to prepare them separately)
- PBG status (issued, in progress or not yet applied for)
- Your plan for formwork and scaffolding (buy, hire, or provided by ALLMAR)
FAQ
Are formwork and scaffolding included in labour only?
Erecting and striking them is included. The formwork and scaffolding materials can be bought by you, hired, or supplied by ALLMAR at extra cost; the choice is written in the cost plan.
Who does the structural design for a two-storey house?
A structural engineer calculates it and issues reinforcement drawings. If you do not have them, ALLMAR can prepare them as a separate design service before building.
Can I build in phases, ground floor first?
Yes, provided the foundations and columns are designed for two storeys from the start. The contract can be split into phases to suit your budget.
How much is labour for a two-storey house per m²?
From Rp2.500.000 per m² for a standard specification. The price per m² is set after the survey and a review of the structural drawings. Concrete volume, reinforcement and stairs make it differ from a single-storey house. ALLMAR works within your budget: share your budget range and our team fits the scope of work.
